Outcomes

Deliverables

MINOAS outputs eleven (11) deliverables of two (2) different types:

(i) administrative coming from work package (WP) 1, and

(ii) technical from the rest of the WPs.

The deliverables are either reports or preprints.  

demo-attachment-1569-Group-14728

WP1

Project Management, Innovation, Dissemination & Communication Management

Task 1.1-Administrative & Financial Coordination

Task 1.2 Technical, Scientific & Innovation Management

Task 1.3 Dissemination Activities

Type: Report

Dissemination level: Public

Due Date: Month 3

Description: This handbook will enclose all procedures and guidelines for the administrative and management requirements of the project. The innovation strategy is defined in D1.1 in terms of ensuring the project excellence. It will report the required processes and procedures for assessing the quality and the guidelines and risk assessment plans of the project. Finally, it will address the lifecycle and public availability of research data generated by the project.

Read D1.1.

Type: Report

Dissemination level: Confidential 

Due Date: Month 5

Description: This deliverable documents the MINOAS’s plan for dissemination, and communication activities.

Type: Report

Dissemination level: Confidential 

Due Date: Month 24

Description: It reports the overall project achievements during the project, including the final dissemination, technical, management, financial throughout the MINOAS implementation.

Type: Publication submission

Dissemination level: Public

Due Date: Month 18

Description: The publication will summarize the results of the three tasks of WP2, by elaborating on the requirements of beyond the fifth generation (B5G) applications (Task 2.1), presenting the MINOAS approach and discussing its advantages and limitations (Task 2.2), providing performance assessment results (Task 2.3).

WP2

Requirements, limitations, and system model

Task 2.1 Requirements and Specification Definition

Task 2.2 Overall system architecture definition

Task 2.3 System modeling (M02-M18)

WP3

Theoretical framework

Task 3.1-Optics-Signal modeling interface development

Task 3.2-Performance analysis

Task 3.3-Beyond Shannon Information Theoretic Framework

Type: Publication submission

Dissemination level: Public

Due Date: Month 22

Description: This publication will report the results of Tasks 3.1, 3.2, and 3.3.

Type: Publication submission

Dissemination level: Public

Due Date: Month 19

Description: The publication will summarize the results of Tasks 4.1 and 4.2. 

Type: Publication submission

Dissemination level: Public

Due Date: Month 20

Description: The publication will summarize the results of Tasks 4.3. 

WP4

Physical layer and signal processing techniques

Task 4.1-Novel energy and spectral efficient transmission and reception schemes development

Task 4.2-Intelligent receiver development for de-emphasizing the impact of hardware imperfections on the performance of ORIS-empowered OWC systems

Task 4.3-ML-enabled light positioning

WP5

Novel joint spatial MAC and RA protocol

Task 5.1-ORIS-empowered cell-free GF and SGF NOMA policies

Task 5.2-Reinforcement learning-based adaptation in ORIS-empowered OWC systems

Type: Publication submission

Dissemination level: Public

Due Date: Month 21

Description: This publication will report the results of Task 5.1.

Type: Publication submission

Dissemination level: Public

Due Date: Month 24

Description: This publication will report the results of Task 5.2.

Type: Report

Dissemination level: Public

Due Date: Month 13

Description: It provides the demonstration scenario and plan as well as the key performance indicators that will be measured.

Type: Demonstrator

Dissemination level: Public

Due Date: Month 24

Description: The publication will summarize the results of Tasks 4.2 and 6.3. 

WP6

Demonstration of ORIS-empowered OWC systems

T6.1 Definition of demonstration scenarios and performance evaluation planning

T6.2 ORIS beam steering demonstrator

T6.3 ORIS beam splitting demonstrator