Outcomes
Deliverables
MINOAS outputs eleven (11) deliverables of two (2) different types:
(i) administrative coming from work package (WP) 1, and
(ii) technical from the rest of the WPs.
The deliverables are either reports or preprints.

WP1
Project Management, Innovation, Dissemination & Communication Management
Task 1.1-Administrative & Financial Coordination
Task 1.2 Technical, Scientific & Innovation Management
Task 1.3 Dissemination Activities
D1.1-Project Administrative, Technical & Data Management Handbook
Type: Report
Dissemination level: Public
Due Date: Month 3
Description: This handbook will enclose all procedures and guidelines for the administrative and management requirements of the project. The innovation strategy is defined in D1.1 in terms of ensuring the project excellence. It will report the required processes and procedures for assessing the quality and the guidelines and risk assessment plans of the project. Finally, it will address the lifecycle and public availability of research data generated by the project.
Read D1.1.
D1.2-Dissemination and Communication Plan
Type: Report
Dissemination level: Confidential
Due Date: Month 5
Description: This deliverable documents the MINOAS’s plan for dissemination, and communication activities.
D1.3-Final Report
Type: Report
Dissemination level: Confidential
Due Date: Month 24
Description: It reports the overall project achievements during the project, including the final dissemination, technical, management, financial throughout the MINOAS implementation.
D2.1-Architecture presentation paper submission
Type: Publication submission
Dissemination level: Public
Due Date: Month 18
Description: The publication will summarize the results of the three tasks of WP2, by elaborating on the requirements of beyond the fifth generation (B5G) applications (Task 2.1), presenting the MINOAS approach and discussing its advantages and limitations (Task 2.2), providing performance assessment results (Task 2.3).
WP2
Requirements, limitations, and system model
Task 2.1 Requirements and Specification Definition
Task 2.2 Overall system architecture definition
Task 2.3 System modeling (M02-M18)
WP3
Theoretical framework
Task 3.1-Optics-Signal modeling interface development
Task 3.2-Performance analysis
Task 3.3-Beyond Shannon Information Theoretic Framework
D3.1-ORIS-empowered OWC performance analysis paper submission
Type: Publication submission
Dissemination level: Public
Due Date: Month 22
Description: This publication will report the results of Tasks 3.1, 3.2, and 3.3.
D4.1-Intelligent receiver for de-emphasizing the impact of hardware imperfections on the performance of ORIS-empowered OWC systems paper submission
Type: Publication submission
Dissemination level: Public
Due Date: Month 19
Description: The publication will summarize the results of Tasks 4.1 and 4.2.
D4.2-ML-enabled light positioning methodology journal
Type: Publication submission
Dissemination level: Public
Due Date: Month 20
Description: The publication will summarize the results of Tasks 4.3.
WP4
Physical layer and signal processing techniques
Task 4.1-Novel energy and spectral efficient transmission and reception schemes development
Task 4.2-Intelligent receiver development for de-emphasizing the impact of hardware imperfections on the performance of ORIS-empowered OWC systems
Task 4.3-ML-enabled light positioning
WP5
Novel joint spatial MAC and RA protocol
Task 5.1-ORIS-empowered cell-free GF and SGF NOMA policies
Task 5.2-Reinforcement learning-based adaptation in ORIS-empowered OWC systems
D5.1-ORIS-empowered cell-free GF and SGF NOMA
Type: Publication submission
Dissemination level: Public
Due Date: Month 21
Description: This publication will report the results of Task 5.1.
D5.2-Reinforcement learning based adaptation in ORIS-empowered OWC systems
Type: Publication submission
Dissemination level: Public
Due Date: Month 24
Description: This publication will report the results of Task 5.2.
D6.1-Report on the demonstration scenarios and description of testbed implementation plan
Type: Report
Dissemination level: Public
Due Date: Month 13
Description: It provides the demonstration scenario and plan as well as the key performance indicators that will be measured.
D6.2-ORIS beam steering and/or splitting demonstrator
Type: Demonstrator
Dissemination level: Public
Due Date: Month 24
Description: The publication will summarize the results of Tasks 4.2 and 6.3.
WP6
Demonstration of ORIS-empowered OWC systems
T6.1 Definition of demonstration scenarios and performance evaluation planning
T6.2 ORIS beam steering demonstrator
T6.3 ORIS beam splitting demonstrator